PMP考试每天一练-2019年PMP考试试题7
PMP考试试题一: An architect creates design drawings for a bridge which will be presented to the client in the next meeting. In an internal design review meeting, the architect realizes there is a flaw in the design that needs to be corrected.What should the architect do next? A.Initiate changes to the requirements B.Initiate the change control process to revise the design C.Escalate the issue to the stakeholders D.Revise the design drawings and present them to the team 一名设计师为一座桥梁制作了设计图纸,并将在下一次会议上提交给客户。在内部设计评审会议上,该名设计师意识到设计存在一个缺陷,需要修改。设计师下一步应该怎么做? A.提出需求变更。 B.提出变更控制流程,修改设计。 C.将问题上报给干系人。 D.修订设计图纸,并将其提交给团队。 PMP答案解析:缺陷补救是变更请求的一种,首先应该提出变更 PMP参考答案:A PMP考试试题二 During a time-critical project, various workflows are operating in parallel. Which of the following quality control measures should the project manager apply to indicate when a schedule for one of the workflows is above the upper specification limits? A.Tolerance limits B.Control limits C.Variable sampling D.Attribute sampling 在一个对时间要求严格的项目中,不同工作流并行操作。项目经理应应用下列哪一项质量控制措施来表示其中一个工作流的进度高于规格上限? A.公差界限 B.控制界限 C.变量抽样 D.属性抽样 PMP答案解析:公差相当于规格界限 PMP参考答案:A |