PMP考试每天一练-2019年PMP考试试题119

作/转载者:PMP团购网      发布时间:2019/9/23        点击: 270

PMP考试试题一:

A project reaches its midway point, at which US$200,000 of work should have been performed. Only US$180,000 worth of work was performed at an actual cost (AC) of US$220,000.What is calculated based on this information?

A. Cost performance index (CPI) = 0.81

B. Estimate at completion (EAC) = US$400,000

C. Budget at completion (BAC) = US$500,000

D. Schedule performance index (SPI) = 1.1

一个项目达到其中途点,这时应该已经完成200,000美元的工作。但只执行180,000美元的工作价值,实际成本(AC)却为220,000美元。根据这个信息可以计算出哪一项?

A.成本绩效指数(CPI)=0.81

B.完工估算(EAC)=400,000美元

C.完工预算(BAC)=500,000美元

D.进度绩效指数(SPI)=1.1

PMP答案解析:EV/AC

PMP参考答案:A

PMP考试试题二

A project manager is assigned to an existing project that will start the implementation phase. Upon review of the planning documents, it is identified that some requirements were not included as defined in the scope statement.What should the project manager do next?

A.Address the missing requirements in the work breakdown structure

B.Revise the scope statement and begin the execution

C.Follow the steps as defined in the integrated change control process

D.Meet with the sponsor to re-define the product requirements

项目经理被任命管理一个将开始实施阶段的现有项目,在查看规划文件时,发现一些需求并未包含在范围说明书中,项目经理接下来应该怎么办?

A.在制定工作分解结构的过程中制定漏掉的需求

B.修改范围说明书并开始执行

C.遵循变更管理流程

D.与项目发起人碰面从新定义产品需求

PMP答案解析:更新受控文件需要遵循变更管理流程。

PMP参考答案:C

阅读本文的人还阅读了:
PMP的价值在哪?
PMP认证考试的报名条件?
PMP是什么?
香港PMP考试地点在哪里?
青岛PMP考试地点在哪里?
潍坊PMP考试地点在哪里?


留言讨论区
我也来说两句


获取更新

合作与联系

友情链接: PMP培训团购网 安徽成考网 健身教练培训 项目管理者联盟 天津坦途教育网 磨石建筑教育 光环国际 德学培训网 湖南自考 中公考研网校 上学
PMP团购导航
北京PMP团购
上海PMP团购
广州PMP团购
深圳PMP团购
江浙PMP团购
西部PMP团购
东北PMP团购
其他城市团购
远程PMP团购
PMP团购网
免费领PMP团购券