以下城市均已开通:
关闭
当前位置:PMP团购网 > PMP考试资料 > 正文

PMP考试每天一练-2018年PMP考试试题123

转载者:PMP团购网      发布时间:2018/10/12        点击: 4239

PMP考试试题一:

To guarantee their next project delivery, two project teams require the same critical resource within the same timeframe. What should the project manager do first?

A.Inform the customer that the delivery will be delayed

B.Advise the resource to work overtime to complete both activities

C.Review the human resource management plan and contact a preferred consulting firm

D.Arrange a joint problem-solving session with the two team leaders to identify possible actions

为保证下一次项目交付,两个项目团队在相同的时间范围内需要相同的关键资源。项目经理首先应该做什么?

A.通知客户将延迟交付

B.通知资源加班工作完成两项活动

C.审查人力资源管理计划并联系一家首选顾问公司

D.与两名团队领导安排一次联合问题解决会议,确定可能的行动

PMP答案解析:积极的主动解决问题

PMP参考答案:D

PMP考试试题二

A project manager identifies that a product can be improved with additional features without impacting the schedule, budget, or resources. Believing that all original requirements are met with these added features, the project manager does not inform the client to what does this refer?

A.Scope creep

B.Scope baseline

C.Scope float

D.Scope change

项目经理确定产品可以通过增加额外功能得以改进,但不影响进度、预算或资源。相信这些新增的功能能满足所有原始需求,项目经理没有通知客户。这称为什么?

A.范围蔓延

B.范围基准

C.范围浮动

D.范围变更

PMP答案解析:未经批准的范围变更,属于范围蔓延

PMP参考答案:A

阅读本文的人还阅读了:
PMP考试题型是什么?
PMP考试内容是什么?
PMP考试有题库吗?
PMP考试报名费是多少?
杭州PMP培训哪个好?几大杭州PMP培训机构对比
苏州PMP培训哪个好?几大热门苏州PMP培训机构对比
成都PMP培训哪个好?几大热门成都PMP培训机构对比

网站更新

合作与联系

PMP团购导航
远程PMP团购
北京PMP团购
上海PMP团购
广州PMP团购
深圳PMP团购
江浙PMP团购
西部PMP团购
其他城市团购



PMP题库