PMP考试练习题一:

一个施工项目的项目团队完成了第一版工作分解结(WBS)。团队员工询问是否有必要将项目团队的工作包含进 WBS 中。项目经理应向该团队成员提供下列哪一项建议?

A project team for a construction project completes the first version of the work break structure (WBS). A team member asks whether it is necessary to include the project team’s work package to the WBS.Which of the following advise should project manager provide to the team?

A:没有必要包含这项工作,因为这个不属于产品范围的组成部分。

It is not necessary to include this work, because it is not part of the product scope (I only heard about project scope, not product scope, from my perspective should be project scope, however the direct translation would be product scope)

B:这项工作应包含在预算中,但不包含在WBS中。

This work should be included in the budget, but not in the WBS.

C:没有必要包含这项工作,因为它属于一项间接成本。

It is not necessary to include this work, because it is an indirect cost.

D:这项工作应包含在WBS中

This work should be included in the WBS.

PMP考试答案解析:所属过程组:规划过程组。所属知识领域:项目范围管理。WBS的100%原则包含了全部的产品和项目工作,包括项目管理工作。

PMP考试参考答案:D

PMP考试练习题二:

收集需求的工具与技术中,通常采取“一对一”的形式的是:

A. 访谈

B. 问卷调查

C. 德尔菲技术

D. 引导式研讨会

PMP考试参考答案:A

阅读本文的人还阅读了:
PMP认证报名条件是什么?
最新PMP考试费用多少?
苏州pmp培训机构哪家好?
2023年PMP考试时间
pmp报考条件大专可以吗?
考pmp必须参加培训吗?
什么是PMP?
pmp考试时间2023年
PMP考试报名费是多少?

网站更新

合作与联系

PMP团购导航
远程PMP团购
北京PMP团购
上海PMP团购
广州PMP团购
深圳PMP团购
江浙PMP团购
西部PMP团购
其他城市团购



PMP题库