以下城市均已开通:
关闭
当前位置:PMP团购网 > PMP考试资料 > 正文

PMP考试每天一练-2020年PMP考试练习题159

转载者:PMP团购网      发布时间:2020/12/2        点击: 1270

PMP考试练习题一:

A project manager creates the work breakdown structure (WBS) and WBS dictionary. What factor should be used to determine the level of detail of the work package?

A. Top-down approach

B. Complexity of the project

C. Form of the WBS structure

D. Individual work component

项目经理创建了工作分解结构(WBS)和WBS词典。应该使用下列哪一个因素来确定工作包详情和层次?

A. 自上而下法

B. 项目的复杂性

C. WBS结构的格式

D. 单个的工作组成部分

PMP考试答案解析:工作包的详细程度因项目的大小与复杂程度而异。

PMP考试参考答案:B

PMP考试练习题二

During a project status meeting, the project manager reviews with the team several risk areas and suggests a mitigation plan for each risk area. A team member suggests a different mitigation strategy for two risks. The project manager reviews all options with the project team. Which of the following modes of conflict resolution does the project manager use?

A, Collaboration/Problem Solve

B. Withdrawal/Avoid

C. Compromise/Reconcile

D. Force/Direct

在项目状态会上,项目经理与团队一起审查多个风险领域,并为每个风险领域建议一个减轻计划。一名团队成员为两个风险建议了一种不同的风险减轻策略。项目经理与项目团队一起审查所有方案。项目经理使用的是下列哪一种冲突解决模式?

A.合作/解决问题

B.撤退/回避

C.妥协/调解

D.强迫/命令

PMP考试答案解析:项目经理与项目团队一起审查所有方案,这是合作/解决问题。

PMP考试参考答案:A

阅读本文的人还阅读了:
pmp考试是英文的吗?
pmp是什么考试?
pmp考试通过率?
pmp考试需要什么学历?
项目管理师pmp报考条件?
pmp可以自己报考吗?
pmp考试科目?
珠海PMP考试地点在哪里?

PMP团购导航
远程PMP团购
北京PMP团购
上海PMP团购
广州PMP团购
深圳PMP团购
江浙PMP团购
西部PMP团购
其他城市团购



PMP题库