PMP考试每天一练--PMP考试试题176
PMP考试试题一: A seller is awarded a contract to build a pipeline. The contract terms and conditions require that a work plan be issued for the buyer's approval prior to commencing work, but the seller fails to provide one. Which of the following is the BEST thing for the buyer's project manager to do? A. File a letter of intent. B. Develop the work plan and issue it to the seller to move things along. C. Issue a default letter. D. D. Issue a stop work order to the seller until a work plan is prepared. 卖方被授予一个管道建设合同。合同条款规定要在开始工作之前发布工作计划以取得买方的批准,但是卖方未能提供工作计划。下列哪项是买方的项目经理最好的做法? A. 记录意向书 B. 开发工作计划并向卖方发布 C. 发布违约信 D. 向卖方发布中止工作表,直到编制完工作计划 PMP答案解析:合同管理 PMP参考答案:C.发布违约信 PMP考试试题二: You are working with a group of managers to decide which projects to pursue. Cost is an important consideration.Whick type of costs should not be a criteria in project selection? A. Indirect costs. B. Sunk costs. C. Tangible costs. D. Intangible costs. 你和一个经理团队一起决定进行哪一些项目,成本是重要的考虑因素,下面哪一项不是项目选择的标准? A. 直接成本。 B. 沉没成本。 C. 有形成本。 D. 无形成本。 审题:此题解题的关键是找到题干关键句“决定进行”、 “不是” 定位:成本管理的拓展。 解析: 1、有形和无形成本及收益的分类主要是为了确定所估计的项目成本和收益的可确定程度。有形成本(tangible costs)或有形收益(tangible benefits)是能够容易地用货币来衡量的成本或收益。 2、项目的无形收益通常包括与其他企业建立良好关系,树立威信以及其他一些很难用货币来衡量的生产力进步。因为无形成本和收益很难量化,因而它们通常很难加以证明。 3、直接成本(direct costs)是直接与项目的产品和服务的生产相关的成本。你能够把直接成本直接归结于某一项目。例如,项目中全职工作人员的薪金、为项目专门购买的硬件和软件等都是直接成本。项目经理应该重视直接成本,因为它们是可控的。 4、间接成本(indirect costs)是与项目的产品和服务的生产不直接相关的成本,但是它们间接的与项目的绩效挂钩。例如,在一个大的办公楼里,为许多项目工作的上千员工所使用的电力费用、纸巾等都是间接成本。间接成本是分摊给项目的,因此,项目经理很难控制。 5、沉没成本(sunk cost)是过去已经花掉的钱,它就像沉船一样永远不会回来。当决定投资或继续投资哪些项目时,应该不考虑沉没资本。 PMP参考答案:B. 沉没成本 |