PMP考试每天一练--PMP考试试题169
PMP考试试题一: A manufacturing project is conducted under limited time constraints. At the point of delivery. A large batch of components must be scrapped, as they do not meet the industry minimum requirements. What should the project manager have done to prevent this problem? A.Surveyed the industry standards and enterprise environmental factors. B.Initiated quality audits to ensure that the planned quality assurance activities are followed C.Increased the focus on risk identification, mitigation and contingencies. D.Obtained approval from the sponsor to extend project time line. 一个制造项目是在有限的时间约束条件下开展的,交付时,一大批部件必须废弃,因为他们不满足行业最低要求。若要防止这个问题,项目经理应该做什么? A.调查的行业标准和企业环境因素 B.引入质量审核,以确保活动质量 C.提高对风险和突发事件的识别,缓解能力 D.获得赞助商对延长项目时间的批准 PMP答案解析:质量审计目的 (8.2.2.2)P247 PMP参考答案:B. 引入质量审核,以确保活动质量 PMP考试试题二: Who of the following has primary responsibility for establishing design and test specifications? A.Senior management. B.Procurement. C.Engineering. D.Quality control. 谁负责制定设计和测试规范? A.高级管理层 B.采购部门 C.工程部 D.质量控制 审题:此题解题的关键是找到题干关键句“制定”和“规范”。 定位:质量管理领域的拓展 解析:技术专家应该负责制定具体规范。 PMP参考答案:C.工程部 |