以下城市均已开通:
关闭
当前位置:PMP团购网 > PMP考试资料 > 正文

PMP考试每天一练--PMP考试试题131

转载者:PMP团购网      发布时间:2017/8/4        点击: 2070

PMP考试试题一:

The buyer and seller bargain on a fixed price plus incentive fee contract, the aim cost of the contract is 200000 dollars, the aim profit is 30000 dollars, the aim price is 230000 dollars, the two parties also consult the highest price at 270000 dollars, the halve ratio is 70/30, if the seller accomplished the fact cost is 170000 dollars, how much profit should the buyer pay for theseller?

A. $21000

B. $35000

C. $39000

D. $51000

买方和卖方商定了一个总价加激励的合同,合同的目标成本是200000美元,目标利润是30000美元,目标价格是230000美元,双方还商定了最高价格为270000美元,分享比率为70/30,如果卖方完成合同的实际成本为170000美元,那么买方要向卖方支付多少利润?

A. 21000美元

B. 35000美元

C. 39000美元

D. 51000美元

PMP参考答案:C. 39000美元

PMP答案解析:规划采购输-合同类型 ( 12.1.1.9 ) P362

PMP考试试题二:

A project manager is quantifying risks for her project. Several of her experts are off-site, but wish to be included in the risk assessment portion of the project. How can this be done?

A. Use Monte Carlo simulation through Internet as a tool.

B. Apply the critical path method.

C. Do a brainstorming.

D. Apply the Delphi technique.

一名项目经理正在为自己的项目进行量化。几位参与项目的专家都不在现场,但是希望参与项目风险评估工作。如何实现这一点?

A. 依托因特网,使用 Monte Carlo模拟方法。

B. 使用关键路径法。

C. 进行头脑风暴。

D. 使用 Delphi技术。

审题:此题的关键是“几位参与项目的专家都不在现场” ,“项目风险评估”。

定位:规划过程组·项目风险管理·识别风险·信息收集技术

解析:D选项德尔菲技术是组织专家就某个专题达成一致意见的一种方法。项目风险专家匿名参与,符合题干所说的几位参与项目的专家都不在现场的条件。A、B选项不属于可用于风险识别信息收集技术中的工具。C选项需要专家在场才可以做。

PMP参考答案:D. 使用 Delphi技术。

阅读本文的人还阅读了:
PMP一般的学习流程简介
PMP项目管理考试费用变更
PMP试题权重比例及评分规则
PMP审查常见问题
PMI为什么不公布PMP题目和PMP考试答案
PMP报考条件和PMP报考流程

网站更新

合作与联系

PMP团购导航
远程PMP团购
北京PMP团购
上海PMP团购
广州PMP团购
深圳PMP团购
江浙PMP团购
西部PMP团购
其他城市团购



PMP题库