PMP考试每天一练--PMP考试试题119
PMP考试试题一: Two days before a project’s delivery date. The project sponsor wants to verify that all deliverable meet the business objectives, and that all the changes were applied throughout the project life cycle. The project manager knows that the project has been well documented from the beginning. What should the project manager provide to sponsor? A. All versions of the project management plan B. Requirement traceability matrix C. Project scope statement D. copy of the project charter 项目交付日期前两天,项目发起人希望核实是否所有可交付成果均满足业务目标以及在项目生命周期过程中是否已应用所有变更。项目经理从开始就知道文档齐全。项目经理应该向项目发起人提供什么文件? A. 项目管理计划的所有版本 B. 需求跟踪矩阵 C. 项目范围说明书 D. 项目章程副本 PMP参考答案:B. 需求跟踪矩阵 PMP答案解析:收集需求输出-需求跟踪矩阵(5.2.3.2)P117 PMP考试试题二: Management wants to be sure that the project is following defined quality standards. Which of the following should they look at? A. Risk management plan. B. WBS. C. Statement of work. D. Quality audit. 管理层希望项目严格遵守定义好的质量标准,他们应该查看以下哪项内容? A.风险管理计划。 B.工作分解结构。 C.工作说明书。 D.质量审计。 审题: 此题的关键字为“项目严格遵守定义好的质量标准”。 定位: 执行过程组·实施质量保证·质量审计 解析: 1、题干中说管理层希望项目严格遵守定义好的质量标准,质量审计报告中包含了确定项目活动是否遵循组织和项目的质量标准,所以D为正确答案; 2、风险管理计划描述将如何安排与实施项目风险管理,它是项目管理计划的子计划,包括方法论、角色与职责、预算、时间安排、风险类别和风险概率和影响的定义,所以答案A与题干所述无关; 3、工作分解结构是把项目可交付成果和项目工作分解成较小、更易于管理的组成部分,所以答案B也不对; 4、工作说明书是对项目可交付产品或服务的叙述性说明,所以答案C也不对。 PMP参考答案:D.质量审计。 |