PMP考试每天一练--PMP考试试题-71
PMP考试试题一: You are managing a project in a just in time environment. This will require more attention, because the amount of inventory in such an environment is generally: A. 45 percent. B. 10 percent. C. 12 percent. D. 0 percent. 你正在管理及时制项目,这要求投入更多精力,因为一般及时制中的库存量为: A. 45% B. l0% C. 12% D. 0% PMP参考答案:D. 0% PMP答案解析:Just in time及时制(零库存) PMP考试试题二: A project manager for a large manufacturing concern is working on a project that calls for a building to be constructed to house a new clean system manufacturing process that is critical to the success of the project. Construction is not a core competency of his company. His team has the ability to create a detailed procurement statement of work, with penalties if specific statements of work deliverables are not met. He is in the Plan Procurements process, evaluating which contract would work the best. Which of the following is the BEST type of contract for this situation? A. Fixed price (FP). B. Cost plus fixed fee (CPFF). C. Cost plus incentive fee (CPIF). D. Time and material (T&M ). 项目经理目前正在考虑建造一个配置新空调系统的工厂。由于建筑并非该公司的强项,他们决定将该工作外包。项目经理的团队有能力编写详细的SOW,其中还包括由于无法达成某种条件而设计的惩罚条款。你认为最合适的合同类型是: A. 固定总价合同(FP)。 B. 成本加固定费合同(CPFF)。 C. 成本加激励费合同(CPIF)。 D. 工料合同(T&M)。 审题: 本题的关键字是“合适的合同类型”,”项目经理的团队有能力编写详细的SOW,其中还包括由于无法达成某种条件而设计的惩罚条款”,涉及到规划采购工具与技术之合同类型。 定位: 规划过程组·项目采购管理·12.1.1.9 规划采购:输入-合同类型 解析: 由于有详尽的SOW,因此应该选择FP,这样对买方风险最小。考点:规划采购的工具-合同类型,需熟悉所有合同类型的定义、特点。 PMP参考答案:A. 固定总价合同(FP)。 |