以下城市均已开通:
关闭
当前位置:PMP团购网 > PMP考试资料 > 正文

PMP考试题库-项目质量管理练习题6-10题

转载者:PMP团购网      发布时间:2014/9/10        点击: 3196

PMP考试题库之项目质量管理6-10题:

6. A group frequency distribution of a set of observations is:
A. The number of observations in the group
B. The frequency divided by the total number of observations
C. An arrangement which shows the frequency of occurrence of the values of the variable in ordered classes
D. A useful picture of the way in which the quality of a product has varied in the past
E. C andD

一组观察的频率分布是:
A. 观察的数量
B. 频率除以总的观察数量
C. 在有序级中变量变化状况的排列情况
D. 是一个有用的图示方法,表示产品质量过去发生的变化
E. C 和D

7. The primary components of the quality management function are:
A. Quality planning
B. Quality control and assurance
C. Quantitative measurement
D. Qualitative assessment of the product
E. A andB

质量管理功能的基本组成是:
A. 质量计划
B. 质量控制和保证
C. 定量衡量
D. 产品的定性评估
E. A 和B

8. Setting the number of defects before the lot is rejected, is a direct responsibility of
A. A functional worker
B. The project manager
C. Management
D. The accounting department

在拒收一批产品之前设置次品数量的工作是谁的直接责任?
A. 职能部门的工作人员
B. 项目经理
C. 管理层
D. 会计部门

9. Which of the following has the greatest effect on a product’s reliability and maintenance characteristic?
A. Conceptualization
B. Product design
C. Fabrication
D. A andB

下面哪些对产品的可信度和维护特性有最大的影响?
A. 概念化
B. 产品设计
C. 生产
D. A 和B

10. On a project the project manager should strive for a “Quality Level” that:
A. is the highest level possible
B. is as close to the project objective as possible
C. represents the least cost to the project
D. exceeds the specified requirements of the project
E. A andD

在一个项目中,项目经理会尽量争取怎样的一个“质量水平”?
A. 尽可能最高的
B. 尽可能贴近项目目标
C. 最少的项目成本
D. 超过项目已定义的需求
E. A 和D

PMP认证考试题参考答案: 6-10 EECDB

阅读本文的人还阅读:

  • PMP考试题型是什么?
  • PMP考试通过率是多少?
    PMP团购导航
    远程PMP团购
    北京PMP团购
    上海PMP团购
    广州PMP团购
    深圳PMP团购
    江浙PMP团购
    西部PMP团购
    其他城市团购



    PMP题库