21. The development of long term goals set by executive management is called:
A. project planning
B. operation planning
C. strategic planning
D. contingency planning
由执行管理层制定的长期目标叫做:
A. 项目计划
B. 运作计划
C. 战略计划
D. 应急计划

22. Who is directly responsible for satisfying project requirements?
A. The functional managers
B. Top management
C. The project manager
D. The project team
E. The customer
谁对满足项目要求负直接责任?
A. 职能部门的经理
B. 高层管理
C. 项目经理
D. 项目团队
E. 客户

23. Which of the following is NOT a process in the project life cycle?
A. Planning
B. Initiating
C. Closing
D. Project reporting
E. Executing
下面哪个不是项目生命周期中的过程?
A. 计划
B. 启动
C. 收尾
D. 项目报告
E. 执行

24. In development of the project plan, which of the following elements should be included to reduce project risk?
A. Project schedules
B. Work breakdown structure
C. Mitigation plans
D. Statement of project objectives
在项目计划的制定中,应该包括下面哪个部分以便减少项目风险?
A. 项目进度
B. 工作分解结构
C. 缓解风险计划
D. 项目目标说明

25. Project feasibility studies are conducted during which of the project phases?
A. Initiating
B. Planning
C. Controlling
D. Project closeout
项目可行性研究是在项目的哪个阶段进行的?
A. 启动
B. 计划
C. 控制
D. 执行
E. 项目收尾

26. Work authorization:
A. is a process of sanctioning project related work
B. is necessary for effective scope management
C. is based on the work package or tasks that are identified in the project/work breakdown structure as the work and cost control elements of the project
D. includes procedures and documents for work orders, contracts, and purchase orders
工作授权:
A. 是关于项目审批相关工作的流程
B. 是有效的范围管理所需要的
C. 是基于工作包或者任务的,这些工作包或者任务在项目/工作分解结构中项目工作和成本控制的元素
D. 包括流程和工作订单、合同和采购订单的文档

27. All of the following are reasons projects fail except:
A. Plans requires too much in too little time
B. Planning is performed by a central planning group
C. Management assumes that all activities will not be completed on schedule
D. Poor financial estimates
下面哪一项不是项目失败的原因:
A. 计划要求的太多,但时间太短
B. 计划的制定是由一个计划中心组来完成的
C. 管理者认为所有的活动都不会按时完成
D. 很差的财务估算

28. Regular changes, which are processed through the change control system:
A. are changes, which impact baseline measurements
B. affect the project’s bottom line and may require additional resources from management reserve
C. will require a modification to the measure of success
D. are coordinated and communicated across all functional areas of the project to ensure complete integration
通过变更控制系统处理的常规变更:
A. 是影响基线衡量的变更
B. 会影响项目的底线,并且可能需要来自管理储备的附加资源
C. 将要求修改成功的标准
D. 在项目所有的职能部门间进行协调和沟通以保证整合的完整性

29. The change control system must include all but which of the following?
A. The paperwork
B. The tracking system
C. Verbal approvals
D. Authorization approval levels
变更控制体系必须包括下面所有内容,除了:
A. 书面工作
B. 跟踪系统
C. 口头批准
D. 授权批准层面

30. During project plan execution:
A. The stakeholder are involved to provide input to the plan
B. The Project Charter is generated
C. A milestone schedule is developed
D. The project manager uses corrective action to bring future performance in line with the project plan
在项目计划执行中:
A. 干系人参与提供项目计划的输入
B. 制定项目章程
C. 制定里程碑
D. 项目经理采取纠偏措施来使今后的执行情况与项目计划保持一致

参考答案:

21-25        26-30
CCDCA        ACDCD